Custom-Fabricated Devices (CFB) such as lifting beams, spreader bars, etc.All rigging machinery, equipment or devices should carry the name of the manufacturer and disclose WLL and be accredited as to their capacity.Utilized a variety of lift plans for various locations. The Lift Plan should be valid for more than one day, as long as the composition, locale, and parameters utilized for developing “worst case” condition have not altered.gross chart capacity) for each particular crane composition and location and activity (e.g., unload a delivery vehicle is contrary to the erecting steel activity).
Crane Lift Planning Process has two Parts-Crane Lift Plan & Crane Daily Safety Review Instructions